-Finished waterproofing motors entirely. The low-speed motor's waterproof box was completed.
The motor in its box. |
Work happening. |
The other two waterproofed motors. |
The box for the low-speed motor, sealed with silicone, and with holes drilled for the driveshaft. |
-Ordered LEGO chain. All parts for drivetrain are now ordered.
-Started work on control box.
-Designed gears to be laser-cut at machine shop.
Goals for next week:
-Laser-cut gears.
-Finish control box.
-Initial assembly and testing.
No comments:
Post a Comment