-Completed waterproofing box for motor, installed motor.
![]() |
| Meet the new box. (Same as the old box.) |
-Installed rotating pipe and attached motors.
| Assembly nearing completion. |
-Largely completed wiring.
-Assembled most of the ROV
![]() |
| Motors have since been attached. |
-Completed designs for sprockets for the chain.
| 8-tooth gear for drive beam. |
| 40-tooth gear for motor beam. |
-Began to put together final presentation.
Goals for next week:
-Finish control box.
-Finish assembling and test the ROV.