Friday, May 25, 2012

Week 8

Accomplishments for this week:

-Received LEGO chain.
-Drilled holes for brackets in PVC piping. Attached the brackets.
-Began assembly of the control box.
Cutting wires for the control box.

-Created design for improved waterproofing box for the low-speed motor.
Designing the improved box.


Goals for next week:

-Assemble and test the whole thing.

No comments:

Post a Comment